2020.09.28 subfloor partial

2020.09.29 subfloor complete

2020.09.30 E,N mudroom walls up

2020.10.01 W mudroom and N wall up

2020.10.03 add W and S walls

2020.10.05 add E and center support walls

2020.10.06 craning of beam

2020.10.07 second floor joists

2020.10.13 interior walls and second floor subfloor

2020.10.19 roof jacks in action, second floor N wall

2020.10.20 all four walls

2020.10.25 garage framing

2020.11.02 garage roof sheathing

2020.11.07 roof sheathing and membrane complete

2020.11.19 backfilling with slinger

2020.11.26 electrical service, crawlspace mold

2020.12.06 roofing & etc.

2020.12.23 roofing, papering, staining

2021.01.19 front porch going up

2021.01.28 windows, posts, beams

2021.01.29 more windows

2021.02.02 windows, paint drying, porch roof

2021.02.03 window hoist setup

2021.02.04 Windows!

2021.02.25 back porch/pergola

2021.04.09 update

2021.04.14 beam disposition

2021.04.15 A34 fix for blocking supporting porch rafters

2021.04.30 concrete for beam fix, etc.

2021.05.13 beam final

2021.07.18 garage siding, electrical service

2021.07.21 siding details

2021.08.28 prepare to demolish shed

2021.10.25 leaky window

2021.10.26 exterior update

2021.12.14 garage floor pour

2021.12.14 garage floor finishing

2022.02.03 HVAC

2022.02.03 Garage doors

2022.04.26 crawlspace plumbing

2022.10.01 partial pump shed

2026.07.25 foundation repair 1

foundation repair 2

foundation repair 3

foundation repair 4